General Contractor J.B. Mouton and Sons selected Bulliard Construction’s Block & Mason Division to perform work during a massive renovation of the Cajundome Arena, located in Lafayette, La.
The project included installing new concrete block beneath the new stadium arena seating area, creating a smaller corridor between the original main concourse and the expanded seats. Bulliard Construction performed both architectural CMU and the physical brickwork surrounding the entire lower level of concession vending areas, gift shops, restrooms, and kitchen areas.
Bulliard Construction Block & Mason Division was honored to take part in the renovation of the iconic Cajundome, South Central Louisiana’s premier sports and event arena.