Lafayette Parish Courthouse

  • Client: Lafayette Parish

While Lafayette Consolidated Government has completed several renovations to the nearly 50-year-old courthouse over the last several years, voters finally determined a full renovation was necessary. Bulliard Construction won the bid in 2013 and has been working on renovating elevators, updating the building for today’s use and making all floors accessible.

Elevator renovations started with floors one and two on the Buchanan side of the building. Bulliard redid equipment interiors and installed electronic bulletin boards in the lobby. The second phase of the job included floors six and seven and entailed removing the ceiling on the sixth floor, along with asbestos abatement. Bulliard changed all of the light fixtures and walls on the sixth floor and cleaned and waxed the floors to make them look brand new.

The seventh floor contained the old jailhouse from the 1960s, so the company had to go in and demolish all of the old jail cells so that they could be converted to office space. Asbestos abatement was needed there too and the floor redone with concrete topping.

Phase three included elevators on floors three, four and five. Previously, elevators three and four went up to the sixth floor and then a key was needed to go to the seventh floor. Bulliard retrofitted these elevators to travel from floors 1-7. Historically, elevator five was used to bring prisoners from the jailhouse to the courtroom and only traveled from floors 7-5. That elevator was enlarged and redone and a penthouse added on top of the existing one.

For the penthouse project, Bulliard had to scaffold 120 feet off the ground on three sides of the building and drop two cables down to the ground. The company rented a construction elevator to work on elevators six and seven and used a swing stage for elevator five, which now travels all the way up to the roof.

This enabled the clerk’s office to move to the seventh floor from floors one and two. The district attorney’s office also moved out of the building to make way for work on the sixth floor.

Renovations are still ongoing and expected to last into 2016.

  • CSA Transitional Housing

    Bulliard Construction is proud to have been involved in the renovation of the Transitional & Emergency Housing facility by Catholic Services of Acadiana (CSA). Additions…

  • Dr. Thomas Bond

    Renovation of Dr. Thomas Bond’s medical office space was completed in the spring of 2018. The project included demolition of existing interior walls, ceilings and…

  • SLEMCO Lobby

    In March 2017, Bulliard Construction completed renovations to the lobby and cashier areas of SLEMCO. Work for the Acadiana-area electric utility included all new finishes…

  • UL Cypress Lake Plaza

    Bulliard Construction is proud to have been selected as the general contractor for the University of Louisiana at Lafayette’s new Cypress Lake Plaza. Located on…

  • Classic Auto Spa

    Bulliard Construction was the general contractor for Classic Auto Spa, located on the corner of Johnston Street and Camellia Boulevard in Lafayette, La. The latest…

  • Peppers Unlimited Warehouse

    Bulliard Construction was proud to be selected as the general contractor for the massive, 19,500-square-foot Peppers Unlimited Warehouse. After the initial site work was done,…

© 2017 Bulliard Construction Co. Inc. All rights reserved. Website design by Bass Consulting.
Terms & Conditions | Privacy Policy