Coil Tubing Services

  • Client: Coil Tubing Services

Built of steel and brick veneer, this 16,500 square-foot building is split into office space and a shop. Bulliard Construction poured 12-inch-thick concrete to hold the company’s two, 15-ton cranes and covered the rear of the site with eight-inch-thick limestone to buttress heavy equipment traffic. The company also designed concrete catch-basins that feed into an oil-water separation system in the floor.

  • CSA Transitional Housing

    Bulliard Construction is proud to have been involved in the renovation of the Transitional & Emergency Housing facility by Catholic Services of Acadiana (CSA). Additions…

  • Dr. Thomas Bond

    Renovation of Dr. Thomas Bond’s medical office space was completed in the spring of 2018. The project included demolition of existing interior walls, ceilings and…

  • SLEMCO Lobby

    In March 2017, Bulliard Construction completed renovations to the lobby and cashier areas of SLEMCO. Work for the Acadiana-area electric utility included all new finishes…

  • UL Cypress Lake Plaza

    Bulliard Construction is proud to have been selected as the general contractor for the University of Louisiana at Lafayette’s new Cypress Lake Plaza. Located on…

  • Classic Auto Spa

    Bulliard Construction was the general contractor for Classic Auto Spa, located on the corner of Johnston Street and Camellia Boulevard in Lafayette, La. The latest…

  • Peppers Unlimited Warehouse

    Bulliard Construction was proud to be selected as the general contractor for the massive, 19,500-square-foot Peppers Unlimited Warehouse. After the initial site work was done,…

© 2017 Bulliard Construction Co. Inc. All rights reserved. Website design by Bass Consulting.
Terms & Conditions | Privacy Policy